What happens after the equipment is installed
Quality control, documentation, warranty cover and spare-parts availability — the parts of a supply agreement that matter most in year five.
Quality Assurance
Documentation that survives procurement scrutiny
Product Documentation
Supplied equipment is accompanied by the manufacturer's technical documentation, covering installation, operation and maintenance requirements.
Country-of-Origin Information
Country-of-origin documentation is provided for supplied equipment, which public-sector and institutional procurement in Bangladesh routinely requires.
Warranty
Cover on supplied equipment
Warranty terms confirmed with your quotation
Warranty coverage, exclusions and the models each period applies to are issued in writing with the quotation and in the warranty documentation supplied with the equipment.
Warranty coverage, exclusions and the models to which each period applies are set out in the warranty documentation issued with the equipment. Terms are confirmed in writing at the quotation stage.
Spare Parts
Availability for the life of the installation
Actual availability depends on the model, the component's lifecycle status and manufacturer supply conditions at the time of enquiry. Confirmation of availability and lead time is provided in response to a spare-parts enquiry.
Spare-parts enquiry
To identify a component quickly, include the elevator's identification details, the building it is installed in, and a photograph of the part if you have one.
- Elevator model and serial details
- Building name and location
- Component description or photograph
- Whether the lift is currently out of service
Certificates & Standards
Compliance documentation
Planning an elevator project? Let's discuss your requirements.
Send us the building details and any drawings you have. We will come back with a specification and a written quotation.